Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Login Login Register 

Search

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo Search

 Login   Tel: +44 (0)118 945 3737

 
     

First VJ Tech Open Day

Jul 19 2016
7
0
First VJ Tech Open Day

VJ Tech hosted a busy customer open day on Tuesday 12th July 2016 at their offices in Reading, Berkshire. The event was well attended by universities and commercial labs from across the country. The day started with a product overviews and demonstrations followed by discussions and a look at VJ Tech's new product development.

Adding Equipment Corrections to Clisp Studio

Adding Equipment Corrections to Clisp Studio
For some testing, system corrections may need to be applied that are not specific to a particular Instrument (e.g. Volume Change due to Cell and tube expansion in an Unsaturated Test). Alternatively, corrections may need to be applied to apparatus used in a Test that is not declared as an Instrument (e.g. frame deformation of an Oedometer). 

Adjusting PID Settings - DSC2000

Adjusting PID Settings - DSC2000

PID settings are used in Clisp Studio in conjunction with a DSC2000 to fine tune the performance of a dynamic servo, both single (DSC2000 M) and dual axis (DSC2000 MM and HM). This support document is not designed to give a full accurate account of what PID’s are and how they are calculated.


Latest Posts

Consolidation Testing - An Introduction
5/21/2019 11:38 AM | info@vjtech.net
An introduction to Direct Shear Testing
3/6/2018 9:53 AM | peter@vjtech.co.uk
Triaxial Testing - an Introduction
10/30/2017 2:03 PM | peter@vjtech.co.uk
Triaxial Cell Sand Sample Preparation
8/14/2017 9:38 AM | peter@vjtech.co.uk
Predicting long term performance of Offshore Wind Turbines using Cyclic Simple Shear
9/15/2016 4:04 PM | prash@vjtech.co.uk

Categories


Archives

2022 Aug 26 1
2021 Dec 80 1
2021 Aug 104 1
2021 Apr 71 1
2021 Jan 3868 1
2020 Dec 84 1
2020 Sep 11577 1
2020 Jul 5723 2
2020 Feb 108 1
2019 Nov 5105 1
2019 Oct 81 1
2019 Jul 168 1
2019 Jun 120 1
2019 May 9612 1
2018 Mar 35751 1
2017 Oct 81075 1
2017 Aug 686 1
2016 Sep 210 1
2016 Jul 7 1
2016 May 32 1
2016 Apr 79 1
2016 Feb 212 3
2016 Jan 160 1
2015 Dec 46 1
2015 Nov 193 1
2015 Mar 1208 4
2015 Feb 982 1
2014 Nov 3216 8
2014 May 636 6
2014 Apr 661 7
2014 Mar 1265 10
2013 Dec 101 1

Tags

Dam
DSS
PID