Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
Triaxial
7 post(s)

Clisp Studio 2.9.0.0 Release

Clisp Studio 2.9.0.0 Release

A major new revision of Clisp Studio has been released. Amongst the many new features are the introduction of new testing standards across many modules, the addition of new instruments and many feature upgrades. 

Coffey Australia - equipment automation and standardisation

Coffey Australia - equipment automation and standardisation

The new equipment and software proved very successful in the first three labs to benefit. It has now been rolled out to two more east coast labs, one in Western Australia and one in New Zealand. Some of the labs have also invested in our sheer, consolidation and permeability testing equipment.

“The decision to use VJ Tech has proved to be a good one,” confirmed Graeme Duske. “Getting to grips with the equipment and software has been an enjoyable learning curve. I’m also satisfied that I have a good working relationship with Richard Pilgrim of Civilab – any difficulties or concerns are treated promptly and with respect.”


Latest Posts

Clisp Studio 2.9.0.0 Release
10/8/2020 1:54 PM | Vasileios
Benefits of the Multi-Purpose Frame
6/27/2019 10:26 AM | Peter Gawen (VJ Tech)
Triaxial Testing - an Introduction
10/30/2017 2:03 PM | Peter Gawen (VJ Tech)
Triaxial Cell Sand Sample Preparation
8/14/2017 9:38 AM | Peter Gawen (VJ Tech)
Case Study on VJ Tech Fully Automated Equipment
11/30/2015 2:32 PM | Prash

Categories


Archives

2020 Oct 63 1
2020 Sep 213 1
2020 Jul 482 2
2020 Apr 87 1
2020 Feb 54 1
2019 Nov 1605 1
2019 Oct 38 1
2019 Jul 76 1
2019 Jun 145 3
2019 May 3567 1
2018 Mar 15061 1
2017 Oct 43968 1
2017 Aug 428 1
2016 Sep 65 1
2016 Aug 91 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 64 1
2016 Mar 31 1
2016 Feb 153 3
2016 Jan 118 1
2015 Dec 33 1
2015 Nov 132 1
2015 May 275 1
2015 Mar 895 4
2015 Feb 729 1
2014 Nov 2360 8
2014 May 494 6
2014 Apr 479 7
2014 Mar 1314 12
2013 Dec 80 1

Tags

Dam
GWD
PID