Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
VJ Tech Limited - Blog
Equipment maintenance
4 post(s)

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery

These ‘Equipment Maintenance’ posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment used for consolidation testing. This post describes how to remove, check and replace the battery on a PCB. This may be when the battery has failed or following a prolonged period where the instrument has been switched off in humid conditions and will not power up.

Equipment Maintenance part 4

These 'Equipment Maintenance' posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment. This post describes how to attach the ACONS earth lead should it prove necessary and how to adjust the screen contrast on the ACONS and other various VJ Tech Instruments. This may be necessary if the screen is too bright or too dark.


Latest Posts

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery
5/30/2014 8:42 AM | LucindaB
Equipment Maintenance part 4
4/30/2014 7:38 AM | LucindaB
Equipment Maintenance Part 2
3/13/2014 8:35 AM | LucindaB
Equipment Maintenance Part 1
3/11/2014 10:53 AM | LucindaB

Categories


Archives

2019 Nov 124 1
2019 Oct 18 1
2019 Jul 29 1
2019 Jun 112 3
2019 May 1020 1
2018 Mar 5491 1
2017 Oct 23790 1
2017 Aug 340 1
2016 Sep 53 1
2016 Aug 70 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 47 1
2016 Mar 22 1
2016 Feb 125 3
2016 Jan 103 1
2015 Dec 30 1
2015 Nov 104 1
2015 May 212 1
2015 Mar 725 4
2015 Feb 602 1
2014 Nov 2029 8
2014 May 415 6
2014 Apr 420 7
2014 Mar 1166 12
2013 Dec 74 1

Tags

GWD
PID