Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
Equipment maintenance
4 post(s)

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery

These ‘Equipment Maintenance’ posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment used for consolidation testing. This post describes how to remove, check and replace the battery on a PCB. This may be when the battery has failed or following a prolonged period where the instrument has been switched off in humid conditions and will not power up.

Equipment Maintenance part 4

These 'Equipment Maintenance' posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment. This post describes how to attach the ACONS earth lead should it prove necessary and how to adjust the screen contrast on the ACONS and other various VJ Tech Instruments. This may be necessary if the screen is too bright or too dark.


Latest Posts

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery
5/30/2014 8:42 AM | LucindaB
Equipment Maintenance part 4
4/30/2014 7:38 AM | LucindaB
Equipment Maintenance Part 2
3/13/2014 8:35 AM | LucindaB
Equipment Maintenance Part 1
3/11/2014 10:53 AM | LucindaB

Categories


Archives

2020 Oct 63 1
2020 Sep 213 1
2020 Jul 480 2
2020 Apr 87 1
2020 Feb 54 1
2019 Nov 1605 1
2019 Oct 38 1
2019 Jul 76 1
2019 Jun 144 3
2019 May 3566 1
2018 Mar 15061 1
2017 Oct 43961 1
2017 Aug 428 1
2016 Sep 65 1
2016 Aug 91 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 64 1
2016 Mar 31 1
2016 Feb 153 3
2016 Jan 118 1
2015 Dec 33 1
2015 Nov 132 1
2015 May 275 1
2015 Mar 895 4
2015 Feb 729 1
2014 Nov 2360 8
2014 May 494 6
2014 Apr 479 7
2014 Mar 1314 12
2013 Dec 80 1

Tags

Dam
GWD
PID