Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
VJ Tech Limited - Blog
Equipment maintenance
4 post(s)

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery

These ‘Equipment Maintenance’ posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment used for consolidation testing. This post describes how to remove, check and replace the battery on a PCB. This may be when the battery has failed or following a prolonged period where the instrument has been switched off in humid conditions and will not power up.

Equipment Maintenance part 4

These 'Equipment Maintenance' posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment. This post describes how to attach the ACONS earth lead should it prove necessary and how to adjust the screen contrast on the ACONS and other various VJ Tech Instruments. This may be necessary if the screen is too bright or too dark.


Latest Posts

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery
5/30/2014 8:42 AM | LucindaB
Equipment Maintenance part 4
4/30/2014 7:38 AM | LucindaB
Equipment Maintenance Part 2
3/13/2014 8:35 AM | LucindaB
Equipment Maintenance Part 1
3/11/2014 10:53 AM | LucindaB

Categories


Archives

2019 Oct 10 1
2019 Jul 21 1
2019 Jun 85 3
2019 May 448 1
2018 Mar 3779 1
2017 Oct 17059 1
2017 Aug 308 1
2016 Sep 41 1
2016 Aug 66 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 41 1
2016 Mar 21 1
2016 Feb 114 3
2016 Jan 97 1
2015 Dec 29 1
2015 Nov 96 1
2015 May 191 1
2015 Mar 670 4
2015 Feb 550 1
2014 Nov 1935 8
2014 May 394 6
2014 Apr 397 7
2014 Mar 1123 12
2013 Dec 129 2

Tags

GWD
PID