Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Login Login Register 

Search

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo Search

 Login   Tel: +44 (0)118 945 3737

 
     
Consolidation
8 post(s)

Sample Assembly for the DSS with Confining Pressure

Sample Assembly for the DSS with Confining Pressure

This Blog covers sample assembly for the Dynamic Simple Shear with Confining Pressure System. This includes undisturbed and remoulded specimens for both confining pressure tests, and confining ring tests.

This system is used for repetitive situations such as offshore wind turbines, where the structure has to withstand the varying strength of wave motion.

Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery

These ‘Equipment Maintenance’ posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment used for consolidation testing. This post describes how to remove, check and replace the battery on a PCB. This may be when the battery has failed or following a prolonged period where the instrument has been switched off in humid conditions and will not power up.


Latest Posts

Sample Assembly for the DSS with Confining Pressure
2/10/2020 10:32 AM | peter@vjtech.co.uk
Sample Preparation - Rowe Cell
10/8/2019 3:26 PM | peter@vjtech.co.uk
Case Study on VJ Tech Fully Automated Equipment
11/30/2015 2:32 PM | prash@vjtech.co.uk
Automatic Consolidation Test System - Datasheet
11/21/2014 4:11 PM | prash@vjtech.co.uk
Consolidation Testing - Equipment Maintenance Part 5 - Replacing the PCB Board Rechargeable Battery
5/30/2014 8:42 AM | campaigns@seojunkies.com

Categories


Archives

2021 Apr 37 1
2021 Jan 550 1
2020 Dec 44 1
2020 Sep 3785 1
2020 Jul 1861 2
2020 Feb 64 1
2019 Nov 2648 1
2019 Oct 47 1
2019 Jul 95 1
2019 Jun 107 1
2019 May 5712 1
2018 Mar 22918 1
2017 Oct 57717 1
2017 Aug 511 1
2016 Sep 73 1
2016 Jul 7 1
2016 May 31 1
2016 Apr 72 1
2016 Feb 165 3
2016 Jan 125 1
2015 Dec 38 1
2015 Nov 148 1
2015 Mar 969 4
2015 Feb 809 1
2014 Nov 2636 8
2014 May 539 6
2014 Apr 521 7
2014 Mar 1093 10
2013 Dec 87 1

Tags

Dam
DSS
PID