Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
VJ Tech Limited - Blog
ACONS
4 post(s)

Equipment Maintenance part 4

These 'Equipment Maintenance' posts are intended to show how to service and perform basic maintenance of different VJ Tech equipment. This post describes how to attach the ACONS earth lead should it prove necessary and how to adjust the screen contrast on the ACONS and other various VJ Tech Instruments. This may be necessary if the screen is too bright or too dark.


Latest Posts

Automatic Consolidation Test System - Datasheet
11/21/2014 4:11 PM | Prash
Using Clisp Studio Part 5 - DAC Linearisation
5/30/2014 9:42 AM | LucindaB
Soil Testing - Automatic Consolidation Testing Part 2
5/30/2014 7:36 AM | LucindaB
Equipment Maintenance part 4
4/30/2014 7:38 AM | LucindaB

Categories


Archives

2019 Jun 31 2
2019 May 131 1
2018 Mar 3103 1
2017 Oct 12535 1
2017 Aug 260 1
2016 Sep 37 1
2016 Aug 62 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 36 1
2016 Mar 19 1
2016 Feb 99 3
2016 Jan 96 1
2015 Dec 29 1
2015 Nov 82 1
2015 May 167 1
2015 Mar 604 4
2015 Feb 483 1
2014 Nov 1846 8
2014 May 361 6
2014 Apr 374 7
2014 Mar 1061 12
2013 Dec 120 2

Tags