Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo

 Login  Register Tel: +44 (0)118 945 3737

 
     
VJ Tech Limited - Blog
Company News
47 post(s)

Benefits of Test Automation

Here at VJ Tech we are proud of our extensive range of consolidation test equipment and software. We have dedicated our time and expertise to build testing equipment that ensures every test carried out is simple, quick, reliable and capable of withstanding high pressured laboratory testing conditions.

How to Upgrade VJ Tech Instrument Firmware.

New Firmware for an Instrument is loaded using the Flash Loader program. If the Flash Loader program needs to be installed, click on the ‘setup.exe’ icon and follow the instructions (Figure 1).  The Firmware for an Instrument will be sent as a compiled Hex file and can be saved in whichever location is required by the User.

Coffey Australia - equipment automation and standardisation

Coffey Australia - equipment automation and standardisation

The new equipment and software proved very successful in the first three labs to benefit. It has now been rolled out to two more east coast labs, one in Western Australia and one in New Zealand. Some of the labs have also invested in our sheer, consolidation and permeability testing equipment.

“The decision to use VJ Tech has proved to be a good one,” confirmed Graeme Duske. “Getting to grips with the equipment and software has been an enjoyable learning curve. I’m also satisfied that I have a good working relationship with Richard Pilgrim of Civilab – any difficulties or concerns are treated promptly and with respect.”


Latest Posts

DSC2000 Calibration - Pressure Transducer
3/30/2015 4:35 PM | Prash
DSC2000 Calibration - Load Cell
3/13/2015 10:39 AM | Prash
DSC2000 Calibration - Displacement Transducer
3/13/2015 10:09 AM | Prash
Attaching and Detaching a Database
3/11/2015 4:54 PM | Prash
De-Aired Water Tank Installation
2/20/2015 10:08 AM | Prash

Categories


Archives

2019 Oct 13 1
2019 Jul 22 1
2019 Jun 89 3
2019 May 587 1
2018 Mar 4208 1
2017 Oct 19219 1
2017 Aug 322 1
2016 Sep 47 1
2016 Aug 66 1
2016 Jul 7 1
2016 May 29 1
2016 Apr 42 1
2016 Mar 21 1
2016 Feb 120 3
2016 Jan 100 1
2015 Dec 30 1
2015 Nov 98 1
2015 May 198 1
2015 Mar 691 4
2015 Feb 567 1
2014 Nov 1968 8
2014 May 401 6
2014 Apr 401 7
2014 Mar 1136 12
2013 Dec 131 2

Tags

GWD
PID